Oops! It appears that you have disabled your Javascript. In order for you to see this page as it is meant to appear, we ask that you please re-enable your Javascript!

Method Statement For Testing & Commissioning Of Cooling Towers

The scope of this method statement is to determine the thermal capability of water cooling towers. Its main purpose is to describe instrumentation and procedures for the testing and performance evaluation of water cooling towers. It is recognized that the data limitations specified throughout this Testing & Commissioning Procedure represent desired conditions which may not …

Method Statement For Testing & Commissioning Of Cooling Towers Read More »

Standby Diesel Generator Installation Instructions

standby diesel generator installation instruction

Before the installation of standby generator the equipment shall be inspected and checked against the relevant general arrangement drawing, approved material submittal. Doors and Panels shall be checked to ensure proper opening and closes. Generator rating, name plate details, Breaker ratings, protection devices, indicators, voltmeter and ammeters shall be checked. The Presence of all identifying …

Standby Diesel Generator Installation Instructions Read More »

Project Site Environmental Health and Safety Management Organization Structure

Project Site Environmental Health and Safety Management Organisation Structure

In addition to the basic project environmental health and safety management organization structure, the organization can setup an independent project safety committee to carry out the following functions: Discuss safety policies and recommend adoption of these by management. Identify unsafe conditions and practices and determine their remedies. Work to obtain results by having its management …

Project Site Environmental Health and Safety Management Organization Structure Read More »

Page 1 of 100
1 2 3 4 100